Rehab Cost Calculator

Create a fast starting allowance for the walkthrough, then replace every placeholder with a measured scope and contractor pricing before you commit.

Direct answer. Estimate rehab costs by separating renovated area, kitchens, bathrooms, systems, exterior work, permits, and contingency, then replace each allowance with a bid. This free calculator does that math in your browser with no account. Use the result as a screen until you walk the house. Updated November 3, 2026. Written by Red. Related: how to estimate rehab costs, rehab budget template, scope of work template, repair budget guide.

FreeNo accountRuns in your browserShareable inputs
Editable assumptions

Enter your scenario

Blue values are assumptions. Change them to match the property and documents in front of you.

Live calculation

What the inputs produce

Results update in your browser. Nothing is uploaded or saved.

Total rehab budget$138,880

Scoped subtotal plus the construction contingency entered.

Scoped subtotal$124,000

All modeled work before contingency.

Contingency reserve$14,880

Reserve calculated from the scoped subtotal.

Budget per renovated sq ft$77.16

Total modeled budget divided by renovated area; use only as a reasonableness check.

Room-specific allowance$46,000

Modeled kitchen and bathroom scope.

Need evidence behind the assumptions?

Move the scenario into a live property record.

Rehabfolio connects comps, scope, financing, schedule, actual costs, documents, and the final outcome.

How to use it

Estimate the rehab before you write the offer.

How to use the rehab cost calculator

Start with a walkthrough, not a listing photo. Note every room you plan to touch, the condition of the roof, mechanicals, windows, and foundation, and anything that looks like water, pests, or past repairs. Then enter the area that will receive real renovation work, not the total size of the house. A bedroom that only needs paint belongs in the area. An unfinished basement you will leave alone does not.

Set the base cost per square foot for general interior work in your market, and price each kitchen and bathroom on its own line. Add the large systems you expect to replace or repair, the exterior and site work, and the permits and design fees. The calculator totals the scoped work, applies your contingency to that subtotal, and shows the full rehab budget. Copy the share link to keep the inputs with the deal.

Line items the calculator covers

Each input is kept separate so a large risk is never hidden inside a blended rate.

  • Area allowance: general interior work such as drywall, paint, flooring, trim, doors, and lighting, priced per renovated square foot.
  • Kitchens: cabinets, counters, fixtures, appliances you include in the scope, and the labor to install them.
  • Bathrooms: fixtures, tile, waterproofing, vanities, and labor for each bathroom.
  • Major systems: roof, HVAC, electrical, plumbing, structure, and windows, entered as one total you can break down later.
  • Exterior and site: siding, paint, decks, landscaping, drainage, access, and cleanup.
  • Permits and design: permit fees, engineering, architectural drawings, testing, and inspection-related costs.
  • Contingency: a percentage reserve applied to everything above.

How to add contingency

Contingency is money set aside for conditions you could not see when you priced the job, such as rot under a tub, wiring that fails inspection once walls are open, or a subfloor that will not hold tile. Pick a percentage that matches how much of the house is still unknown. A verified cosmetic scope needs a smaller reserve than a gut renovation, an older house, or a property you could not fully access.

Keep contingency separate from the line items so you can see when it is being spent. If a known problem shows up during due diligence, add it to the scope as its own line instead of quietly using up the reserve before work starts.

What to do with the rehab number next

A rehab budget is one input to the deal, not the answer. Carry it into the flip profit calculator to see projected profit after financing, holding, and selling costs. Use the maximum allowable offer calculator to turn the budget and your after-repair value into a walk-away price. Then price the time the work will take with the holding cost calculator, because every extra month of rehab adds interest, taxes, insurance, and utilities.

Before you commit, replace the allowances with a written scope of work and contractor bids, and keep the estimate, the scope, and the actual costs together so you can see where the budget moved.

The formula

Know exactly what the calculator is doing.

Rehab budget = area allowance + kitchens + bathrooms + systems + exterior + permits + contingency

Per-square-foot allowances are only a screening device. Separate large systems and room-specific work so they are not hidden inside one blended rate.

A durable workflow

Use the result as a decision aid, not a verdict.

01

Measure the work

Record rooms, quantities, dimensions, assemblies, and observed conditions.

02

Separate uncertain systems

Do not bury roof, foundation, electrical, or plumbing risk in a cosmetic square-foot rate.

03

Replace allowances with evidence

Update the starting budget with written bids, selections, permit research, and verified quantities.

Important limits

What this calculation cannot know.

  • Regional labor and material prices vary materially.
  • Hazardous materials, structural defects, concealed damage, and code upgrades require qualified review.
  • Contingency is not a substitute for a complete scope.

For a deeper explanation, read How to build your first repair budget.

Common questions

Understand the terms before using the output.

How do I estimate rehab costs?

Walk the property and measure the work room by room. Enter the renovated area and a base cost per square foot for general interior work, then price kitchens, bathrooms, major systems, exterior work, and permits as separate lines. Add a contingency to the scoped subtotal. Treat the result as a screening number until written bids, selections, and permit research replace each allowance.

Should I include contingency?

Yes. Every rehab estimate should carry a construction contingency for conditions you cannot see yet. Size it to how complete the scope is and how much is hidden: a cosmetic job on a house you have fully inspected needs less reserve than structural or system work behind walls you have not opened. Contingency covers surprises inside the scope. It does not replace a missing scope.

How is a rehab estimate different from a scope of work?

A rehab estimate is a dollar figure for deciding whether a deal works. A scope of work is the written description of what will be built: rooms, quantities, materials, finish levels, and who does each task. Contractors bid against the scope, so the estimate should be updated with the scope and the bids before you commit.

How accurate is a rehab cost calculator?

It is a screening estimate. Accuracy improves when quantities, specifications, local pricing, and contractor bids replace allowances.

What should cost per square foot include?

Define it explicitly. This calculator treats it as general interior work and keeps kitchens, bathrooms, systems, exterior work, and permits separate.

Should permits be included?

Yes. Include known permit, design, engineering, testing, and inspection-related costs when applicable.

Can I download a repair budget template?

Yes. The Rehabfolio investor toolkit includes a formula-driven rehab budget and scope-of-work workbook.

From calculation to operating record

Keep the assumptions, evidence, work, and outcome together.

Start free. No card required. AI outputs remain drafts until you approve them.